Overhauling of Recycle Gas Compressor Riyadh Refinery 2019 TRS
- Inspection & Refurbishment of Z97-K-002 Compressor
- Dismantling
- Inspection & Replacement of worn out spare parts
- Overhauling, Replacement of bundle, Assembly & Commissioning.
Projects
Recent Projects
-
Enhancement Of Compressor In Utility for SPLP-1 In Hadeed
- Cameron Compressors ( 10,200 Nm3/hr @8 bar) – 2 nos
- Siemens Motors ( 1450 kW) – 2 nos
- ABB MV Soft Starters – 2 nos
- Air Dryer, Heatless Desiccant type (15000 Nm3/hr) – 1 no
- Siemens MV Switchgears – 3 nos
- ABB DCS Modifications
- Detailed Design Package, Civil, Structural, Mechanical, Piping, Electrical,
- Instrumentation and Automation work
-
Saudi Kayan – Turnaround 2016 Instrument Air Compressor Overhaul
-
Saudi Kayan – Turnaround 2015 HDA Compressor Overhaul
-
Saudi Kayan – Turnaround 2013
-
IBN AL-BAYTAR Modification for Air Filter Assembly (2013)
-
Seawater Injection Pump Pilot Project at HdGOSP-2
Images
DOWNLOAD A COMPLETE CATALOG OF OUR CONTRACTING AND SERVICES